Page de couverture de Stranded at Powerline Pass

Stranded at Powerline Pass

Stranded at Powerline Pass

Écouter gratuitement

Voir les détails du balado

À propos de cet audio

Audio track after slicing and dicing. 12 February 2025.

During re-construction of a transmission tower in northwest BC in February, six people were stranded in a lunch shack for four nights. Two of the stranded, avalanche technician Hector MacKenzie and linesman Trevor James, recount the story. Another of the avalanche technicians, Scott Flavelle, provides some background on the powerline and the terrain it runs through. Recorded in January 2025.



Pas encore de commentaire