Page de couverture de #106: Part 1 – Why Choose the German RS Demountable Flood Barrier? – Introduction: The First Flood Is Always Too Late

#106: Part 1 – Why Choose the German RS Demountable Flood Barrier? – Introduction: The First Flood Is Always Too Late

#106: Part 1 – Why Choose the German RS Demountable Flood Barrier? – Introduction: The First Flood Is Always Too Late

Écouter gratuitement

Voir les détails du balado

À propos de cet audio

In this first episode of the mini series Why Choose the German RS Demountable Flood Barrier?, Dr. Andreas Klippe — Dr. Flood, German engineer, entrepreneur, and book author — explains why the first flood is always too late. Learn why waiting until after disaster strikes costs more, disrupts operations, and puts safety at risk. This introduction sets the stage for the global success stories and proven engineering principles in the episodes ahead.
Pas encore de commentaire