Page de couverture de 135 - ZIP-R for CZ 6B - New Construction? Continuous Air Control Layer for Exterior Retrofit CZ 4A?

135 - ZIP-R for CZ 6B - New Construction? Continuous Air Control Layer for Exterior Retrofit CZ 4A?

135 - ZIP-R for CZ 6B - New Construction? Continuous Air Control Layer for Exterior Retrofit CZ 4A?

Écouter gratuitement

Voir les détails du balado

À propos de cet audio

Two great questions about wall assemblies. The boys dig deep, exploring all the variables to consider for both wall assemblies. And no big surprise: Much of the conversation is about how to get these three control layers right (water, air, thermal) and ALSO get the drying potential (vapor) correct.

PETE'S RESOURCES:

- 2021 IRC - Montana

NOTE: The IRC 2021 does NOT include any chapters on energy efficiency/energy requirements...

- Huber Table for ZIP-R recommendations for all climates

- "Check but Verify - Why We Do Multiple Blower Door Tests:" https://www.youtube.com/watch?v=WDD-BpTZJ3I

- "When to Perform a Blower Door Test (and when not to)"

Ce que les auditeurs disent de 135 - ZIP-R for CZ 6B - New Construction? Continuous Air Control Layer for Exterior Retrofit CZ 4A?

Moyenne des évaluations de clients

Évaluations – Cliquez sur les onglets pour changer la source des évaluations.